Health and Business Technology Center – East Wing

Elgin, Illinois

previous arrow
next arrow
previous arrownext arrow
Slider

Kluber Architects + Engineers completed a full interior renovation, including demolition, of the Health and Business Technology Center’s east wing. Kluber renovated a light industrial manufacturing building on the Elgin Community College campus into a new state-of-the-art chemistry facility.

Kluber worked with campus faculty to develop the concept for the new facility within the constraints of the existing building shell. The various project components included a new organic chemistry lab, physics lab, geology lab, general classrooms, as well as new faculty offices and student lounge spaces.

The mechanical and plumbing engineering design for the project was critical in order to coordinate chemical fume hood exhaust with the general HVAC system, along with the required plumbing systems for the laboratories.

Owner

Elgin Community College

Project Type

Addition / Renovation

Services Provided

Architecture
Electrical Engineering
Mechanical Engineering
Structural Engineering
Plumbing Engineering

Project Size

2,610 Square Feet (Addition)
24,964 Square Feet (Renovation)

Project Budget

$6,360,000

Bloomington Office
2401 East Washington Street
Bloomington, Illinois 61704
Chicago Office
222 South Riverside Street Plaza
Chicago, Illinois 60606
Aurora Office
10 South Shumway Avenue
Batavia, Illinois 60510
©2019 Kluber, Inc. All Rights Reserved