Oswego East High School Expansion

Oswego, Illinois

previous arrow
next arrow
previous arrownext arrow
Slider

To prepare for an expected increase in the high school student population, Oswego Community Unit School District 308 conducted a study to determine what facilities would be required to increase the current capacity from 2,400 to 3,200 students.

Based on the results of this facility analysis, the Oswego East High School expansion project included five separate building additions consisting of classrooms, computer labs, science labs, a three-court gymnasium, dance studio, weight and fitness rooms, locker rooms, as well as administrative and student support spaces. Improvements were also made to the overall building circulation.

The school received multiple bidders resulting in extreme value to the District. The median cost for new high schools as reported by the School Planning and Management’s 2012 Annual School Construction Report for the Midwest region was $219.18 per square foot. The bids received by the District for this project equaled just $124 per square foot.

Not having the budget for frills, the Oswego East High School expansion was constructed with solid masonry with ample natural light and durable finishes. The completed project is a great example of the District’s fiscal responsibility while providing quality learning environments for students.

Owner

Oswego CUSD 308

Project Type

Addition / Renovation

Services Provided

Architecture
Electrical Engineering
Mechanical Engineering
Structural Engineering

Project Size

135,887 Square Feet (Addition)
10,562 Square Feet (Remodel)

Project Budget

$21,323,258

Bloomington Office
2401 East Washington Street
Bloomington, Illinois 61704
Chicago Office
222 South Riverside Street Plaza
Chicago, Illinois 60606
Aurora Office
10 South Shumway Avenue
Batavia, Illinois 60510
©2019 Kluber, Inc. All Rights Reserved