Oswego High School Expansion

Oswego, Illinois

Auxiliary Gym (Overall View)
Oswego High School (Main Gym)
Oswego High School Front View 2 (Angle 1)
OHSexpansion
Oswego High School Front View 1
Oswego High School (Interior Locker Area)
previous arrow
next arrow
Auxiliary Gym (Overall View)
Oswego High School (Main Gym)
Oswego High School Front View 2 (Angle 1)
OHSexpansion
Oswego High School Front View 1
Oswego High School (Interior Locker Area)
previous arrow
next arrow

Like many school buildings in growing areas, Oswego High School was a collection of multiple building additions and renovations that had taken place over the years.

Kluber Architects + Engineers was hired to design the much-needed high school expansion. Great care was taken to cohesively integrate the latest building expansion with the existing building and site. The project consisted of classrooms, science labs, physical education spaces, locker rooms, and a gymnasium.

The project also included 42,842 square feet of interior remodeling primarily in the student locker room area, along with a full remodel of the competition gymnasium with new bleachers and a wood floor replacement.

Owner

Oswego CUSD 308

Project Type

Addition / Renovation

Services Provided

Architecture
Electrical Engineering
Mechanical Engineering
Structural Engineering

Project Size

93,121 Square Feet (Addition)
42,842 Square Feet (Remodel)

Project Budget

$17,637,200