Village of Villa Park Fire Station 81
Following the completion of a space management study for Fire Stations 81 and 82, the Village of Villa Park engaged Kluber Architects + Engineers to design and oversee renovations at Fire Station 81. The goal was to modernize the facility, improve functionality for firefighters, and address evolving operational needs while creating a more comfortable and efficient environment for daily use.
The renovation addressed several key areas within the station. Two new flexible-use rooms were added to serve as private offices, bunk rooms, or quiet decompression spaces. Additional improvements included a new ADA-compliant single-user toilet and shower room, two single-user toilet and shower rooms, a dedicated storage area, enhanced bunk spaces with added privacy, an updated kitchen, and a updated front office. The project also included the replacement of two aging air handling units, along with new ductwork and refrigerant lines, improving the station’s overall mechanical performance and reliability.
Beyond the living and administrative spaces, significant upgrades were made to the apparatus bays. Improvements included new trench drains, overhead door improvements, and flooring updates.
To complete the above renovations in a timely manner it was decided that it would be the best choice for the fire department to relocate while the renovations take place. Different options were evaluated but ultimately relocating to a temporary fire station at an existing recreational facility was the best choice. The temporary station was in a desired location and needed minimal renovations to serve the fire department.
The temporary station was adapted through improvements to the existing gymnasium space, including the installation of trench drains, a vehicle exhaust removal system, and a new shower within the existing restroom area. Two overhead doors were added to create apparatus bays, while minor restroom updates were designed to be easily reversible, allowing the facility to return to its original recreational use once Fire Station 81 reopened.
The result is a modernized fire station that better supports the health, wellness, and daily operations of its firefighters while providing the Village with a facility positioned to serve the community for years to come.
-
Client
Village of Villa Park
-
Location
Villa Park, Illinois
-
Year Completed
2026
-
Services Provided
- Architecture
